Case Study: Building Adaptability into Facility Design to Maximize Future Resilience at Minimal Cost

Time: 1:40 pm
day: Day One

Details:

  • Exploring the opportunities for flexible design options and the impacts to project cost and schedule
  • Identifying the main barriers in building flexibility into life science facilities and how to work towards overcoming them
  • Ensuring MEP design has the capacity to deliver multi-modal facilities and prevent cross-contamination

Speakers: