Navigating the Challenges of Building Laboratories to Spec with Developers to Accelerate Speed-to-Market & Adaptability for Any End-User

Time: 3:40 pm
day: Day One

Details:

  • Understanding how to bring maximum value to early conversations with your developer during conceptual design and logistics planning
  • Designing with maximum flexibility and speed to ensure the developer is able to meet the needs of any tenant, and lease the space as quickly as possible: What additional tactics can be deployed in the construction phase to further minimize time to start up?
  • Effectively working with end-users when they are onboarded to support fit-out in line with their requirements

Speakers: